Hotel Swimming Pool

Laos Five Star Hotel Swimming Pool Project

Laos Five Star Hotel Swimming Pool Project

The hotel was built by Laos Jadapeng Group Co., Ltd. and will be one of the reception hotels of the 9th Asia-Europe Summit held in Vientiane, Laos in early November 2012. It is of great political significance.


The swimming pool project started in July this year. The swimming pool specifications are: length 50m* width 15m, water depth: 0.9m-1.5m, cycle: T=6 hours, irregular swimming pool, and a diameter 2m, a circular massage pool with a water depth of 1m.


The swimming pool project's circulating filtration system uses three high-speed filter sand cylinders with a diameter of 1.4m and a height of 1.58m, and four 3.4kw circulating water pumps. The swimming pool disinfection system uses automatic and manual dosing.